If this is the wrong sub let me know and I can delete and move this elsewhere.
How do you move forward with an idea if you aren't exactly sure what the correct solution would be?
I have worked in the same industry (HVAC commercial/industrial equipment) for about 15 years and I've had a problem that has been staring me in the face for the past 6-8 of them. There is a certain process that desperately needs a scheduling software solution.
Every time I google for a solution I get these highly complicated ERP systems or something like Microsoft Project that just has way too many layers for what I'm looking for. I need a MS Project lite, that can be used for high level fast scheduling without hundreds of data points behind the scenes. I don't need that level of detail, just something that can have data entered quickly, and will show a quick visual glance at the status of multiple projects (anywhere from 50-100) . MS Project was a ton of data per project, and it would have taken a very long time to update each step of the process.
I understand coding and have done some very light coding in my past, but nothing that I could build a web based scheduling software. And I also don't even know the exact right solution, I just know what I don't want.
The multiple connections I have in the industry that need this type of software all say they've looked around but never found a good solution and just use excel/outlook calendars.
How can I build the MVP product to at least gauge market interest and start that process? Is it as simple as a landing page with some copy and an infomercial of someone clicking 120 times and then spilling coffee on their keyboard? (not really)
How do you move forward with an idea if you aren't exactly sure what the correct solution would be?
I have worked in the same industry (HVAC commercial/industrial equipment) for about 15 years and I've had a problem that has been staring me in the face for the past 6-8 of them. There is a certain process that desperately needs a scheduling software solution.
Every time I google for a solution I get these highly complicated ERP systems or something like Microsoft Project that just has way too many layers for what I'm looking for. I need a MS Project lite, that can be used for high level fast scheduling without hundreds of data points behind the scenes. I don't need that level of detail, just something that can have data entered quickly, and will show a quick visual glance at the status of multiple projects (anywhere from 50-100) . MS Project was a ton of data per project, and it would have taken a very long time to update each step of the process.
I understand coding and have done some very light coding in my past, but nothing that I could build a web based scheduling software. And I also don't even know the exact right solution, I just know what I don't want.
The multiple connections I have in the industry that need this type of software all say they've looked around but never found a good solution and just use excel/outlook calendars.
How can I build the MVP product to at least gauge market interest and start that process? Is it as simple as a landing page with some copy and an infomercial of someone clicking 120 times and then spilling coffee on their keyboard? (not really)
Dislike ads? Become a Fastlane member:
Subscribe today and surround yourself with winners and millionaire mentors, not those broke friends who only want to drink beer and play video games. :-)
Access Restricted: Unlock 1,000,000+ Posts
Stop Peeking Through the Keyhole.
Open the Door.
You hit a wall because the best advice isn't free—it's earned. Since 2007, MJ DeMarco has been active here daily (99.9% active rate), building a war room for entrepreneurs who refuse to settle for mediocrity.
- Active Daily: Life-changing content posted dozens of times every day. No dead threads.
- MJ's Inner Circle: Direct access to the author of The Millionaire Fastlane.
- Vetted Network: Connect with founders scaling to 7 and 8 figures.
- Proven Roadmaps: Strategy over motivation. Execution over "hustle porn."
"SCALED TO 6-FIGURE MONTHS"
"Tips and advice here saved me from huge mistakes, others allowed me to scale my business to 6-figure months."— User MitchC
"INSANE QUALITY OF PEOPLE"
"The number of high quality people I've met from this forum has been insane. All of it predicated on building real value."— User Richard Peck
"You are the average of the five people you surround yourself with."
Are you surrounding yourself with success?