- Joined
- Jul 23, 2019
- Messages
- 10
Rep Bank
$110
$110
User Power: 10%
I've been designing and developing websites in WordPress and Joomla for about 10 years. I'm usually doing projects that average around $5000.
An old client of mine asked me what I charge for a "quick landing page in Optimize Press". I'm fortunate to be at the point where I usually turn down jobs like this, but I want to do this for him, because I'm hoping for future bigger projects with the client. What is the absolute lowest price that you guys would charge to set up a simple WordPress site? Is it appropriate to limit the Scope of Work to a maximum number of hours on a fixed price job?
I'd like to add language to my Scope of Work that says something like "Based on our conversation, I believe that the project will require less than 3 hours of work. Developer will provide a maximum of 3 hours of work at the fixed rate of $XXX. Beyond 3 hours, client agrees to pay developer at hourly rate of $XX/hr."
I've never tried to do this before. After doing some Googling I have found that this is called a "Time and Materials Not To Exceed (T&M NTE)". Has anyone tried this in the web design/dev vertical? I don't understand if there is a difference between a "T&M NTE contract" and an "hourly rate contract".
What do you guys think?
An old client of mine asked me what I charge for a "quick landing page in Optimize Press". I'm fortunate to be at the point where I usually turn down jobs like this, but I want to do this for him, because I'm hoping for future bigger projects with the client. What is the absolute lowest price that you guys would charge to set up a simple WordPress site? Is it appropriate to limit the Scope of Work to a maximum number of hours on a fixed price job?
I'd like to add language to my Scope of Work that says something like "Based on our conversation, I believe that the project will require less than 3 hours of work. Developer will provide a maximum of 3 hours of work at the fixed rate of $XXX. Beyond 3 hours, client agrees to pay developer at hourly rate of $XX/hr."
I've never tried to do this before. After doing some Googling I have found that this is called a "Time and Materials Not To Exceed (T&M NTE)". Has anyone tried this in the web design/dev vertical? I don't understand if there is a difference between a "T&M NTE contract" and an "hourly rate contract".
What do you guys think?
Dislike ads? Become a Fastlane member:
Subscribe today and surround yourself with winners and millionaire mentors, not those broke friends who only want to drink beer and play video games. :-)
Last edited:
Access Restricted: Unlock 1,000,000+ Posts
Stop Peeking Through the Keyhole.
Open the Door.
You hit a wall because the best advice isn't free—it's earned. Since 2007, MJ DeMarco has been active here daily (99.9% active rate), building a war room for entrepreneurs who refuse to settle for mediocrity.
- Active Daily: Life-changing content posted dozens of times every day. No dead threads.
- MJ's Inner Circle: Direct access to the author of The Millionaire Fastlane.
- Vetted Network: Connect with founders scaling to 7 and 8 figures.
- Proven Roadmaps: Strategy over motivation. Execution over "hustle porn."
"SCALED TO 6-FIGURE MONTHS"
"Tips and advice here saved me from huge mistakes, others allowed me to scale my business to 6-figure months."— User MitchC
"INSANE QUALITY OF PEOPLE"
"The number of high quality people I've met from this forum has been insane. All of it predicated on building real value."— User Richard Peck
"You are the average of the five people you surround yourself with."
Are you surrounding yourself with success?
