Hi All,
Two-Part Question on Goal Setting, i.e. Micro-Goals:
Part One:
A lot of times, projects I am working on can come down to waiting for a follow up E-mail or Call in order to proceed with the next steps forward, which may be Set of Steps "A" or Set of Steps "B", depending on the reply/answer/call/mail/text I am waiting for. Sometimes, this is an outcome out of our control (the return call/mail.etc), and it can really hinder your progress on that specific project.
How do you folks work it into your goal-setting? Right now, I move on to other items, but it is still sticking out like a sore thumb...begging for attention, but you've already left a message or sent an E-mail asking for a reply, etc...VERY furstrating....how do you folks handle this type of goal roadblock?
Part Two:
This is kind of related to Part One, because, these "waiting for follow up" roadblock-hindered project goals need to be treated as if using a completely seperate system if goal-setting...
and I now wind up using the micro-goal process on my other ongoing projects, but there is no unity, because I have to tend to this roadblocked goal path in one way or another.
How can I unify my approach.
I hope this was not too vague...please let me know
Regards,
Rob
Two-Part Question on Goal Setting, i.e. Micro-Goals:
Part One:
A lot of times, projects I am working on can come down to waiting for a follow up E-mail or Call in order to proceed with the next steps forward, which may be Set of Steps "A" or Set of Steps "B", depending on the reply/answer/call/mail/text I am waiting for. Sometimes, this is an outcome out of our control (the return call/mail.etc), and it can really hinder your progress on that specific project.
How do you folks work it into your goal-setting? Right now, I move on to other items, but it is still sticking out like a sore thumb...begging for attention, but you've already left a message or sent an E-mail asking for a reply, etc...VERY furstrating....how do you folks handle this type of goal roadblock?
Part Two:
This is kind of related to Part One, because, these "waiting for follow up" roadblock-hindered project goals need to be treated as if using a completely seperate system if goal-setting...
and I now wind up using the micro-goal process on my other ongoing projects, but there is no unity, because I have to tend to this roadblocked goal path in one way or another.
How can I unify my approach.
I hope this was not too vague...please let me know
Regards,
Rob
Dislike ads? Become a Fastlane member:
Subscribe today and surround yourself with winners and millionaire mentors, not those broke friends who only want to drink beer and play video games. :-)
Access Restricted: Unlock 1,000,000+ Posts
Stop Peeking Through the Keyhole.
Open the Door.
You hit a wall because the best advice isn't free—it's earned. Since 2007, MJ DeMarco has been active here daily (99.9% active rate), building a war room for entrepreneurs who refuse to settle for mediocrity.
- Active Daily: Life-changing content posted dozens of times every day. No dead threads.
- MJ's Inner Circle: Direct access to the author of The Millionaire Fastlane.
- Vetted Network: Connect with founders scaling to 7 and 8 figures.
- Proven Roadmaps: Strategy over motivation. Execution over "hustle porn."
"SCALED TO 6-FIGURE MONTHS"
"Tips and advice here saved me from huge mistakes, others allowed me to scale my business to 6-figure months."— User MitchC
"INSANE QUALITY OF PEOPLE"
"The number of high quality people I've met from this forum has been insane. All of it predicated on building real value."— User Richard Peck
"You are the average of the five people you surround yourself with."
Are you surrounding yourself with success?